Quality
What we check, and when
We inspect at three points in every job. The cadence is the reassurance, not any single measurement.
When we inspect
At every setup
First-off inspection
Before we release a run, we inspect the first piece off the tool against your drawing and the tolerances agreed for that part.
During the run
In-process inspection
We keep checking while the press is running, so drift is caught inside the lot rather than at the end of it.
Before packing
Final inspection
We inspect the finished lot and raise its report before anything is packed.
What we check
The attributes we inspect on a lamination or stamping.
- Slot concentricity
- Stack height
- Burr on punched and slit edges
- Pitch variation
- Blanking ID/OD concentricity
- Overall dimensional conformity to drawing
- Watt loss on electrical steel
- Material grade and thickness against the mill certificate
- Coating condition
- Surface and visual defects
- Pack count and lot identity
The quality system
How we govern the checks.
- Quality assurance plan and control plan
- Held per part, not per factory.
- CTQ format
- We identify and record the critical-to-quality characteristics for each part.
- CAPA
- Corrective and preventive action, with the action documented and closed.
- Calibration control
- We keep our measuring equipment under calibration control.
- Drawing and revision control
- We make parts to the current revision, and we record the revision.
Certification
We are certified to ISO 9001.
- Standard
- ISO 9001
- Certificate
- 24EQOS03
- Scope
- Manufacturing & supply of electrical stampings and magnetic steel laminations
- Valid to
- October 2027
ISO 9001 certificateDocument to followCapability profile (PDF)Document to follow
What you receive
- Mill test certificate
- The source mill's test certificate goes out with every despatch.
- Finished-goods inspection report
- We raise one per lot.
- Lot identity
- We maintain it through packing.
Request a quotation
Send us the drawing with the grade, thickness and monthly volume. If the grade is not settled, say so and we will advise against the application.